Case Study
Baldivis Wastewater
Baldivis, WA · BOSSPIPE™ CC-GRP Jacking Pipe
Baldivis Wastewater
Building Below Ground in Perth
High-Performance Pipe for a Dual-Diameter Alignment
In 2023, Empire supplied 100 metres of DN1200 OD1229 SN30,000 and 56 metres of DN700 OD718 SN80,000 BOSSPIPE™ CC-GRP Jacking Pipe. The two distinct specifications were selected to meet the precise structural demands of each pipeline section. CC-GRP's high strength-to-weight ratio and excellent hydraulic properties made it the most cost-effective and timely solution, factors central to DJ MacCormick's decision to specify BOSSPIPE™ as their preferred pipe.
"When contractors are weighing up options on a programme-driven upgrade, BOSSPIPE™ consistently delivers on both performance and value, and that's exactly what this project called for."
An Evolving Infrastructure Network
The Baldivis area has been subject to ongoing infrastructure upgrades to keep pace with rapid residential growth in Perth's south. The scope encompassed the upgrade of an underground wastewater pump station, overflow storage, and two sections of wastewater pipeline. BMD Constructions engaged DJ MacCormick to deliver the trenchless pipeline sections, with the BOSSPIPE™ jacking pipe installed efficiently and in line with the project schedule.
Reliable Supply for a Programme-Driven Project
The successful completion of both pipeline sections reflects the importance of a reliable supply partner on infrastructure projects where programme certainty is critical. Empire worked closely with the project team throughout design and delivery to ensure the dual-diameter pipe scope met the structural and hydraulic requirements of each section of the alignment.