Case Study
Moonee Valley Sewer Upgrade
Moonee Valley, VIC · BOSSPIPE™ CC-GRP
Moonee Valley Sewer Upgrade
Urban Precision in Moonee Valley
GRP with Pre-Fabricated Bends for a Complex Alignment
Empire supplied 360 metres of DN300 BOSSPIPE™ Centrifugally Cast GRP (CC-GRP) Jacking Pipe along with pre-fabricated bends produced to match the project's specific alignment geometry. The bends allowed the pipeline to follow the required route without additional shafts. DN300 CC-GRP pipe offers the structural stiffness required for microtunnelled installation and strong resistance to the corrosive conditions common in sewer service environments.
"On urban sewer projects, the ability to supply fabricated bends alongside the main pipe run is what makes a complex alignment achievable." Aaron Mackley, Director of Sales & Operations, Empire Infrastructure
Trenchless Installation in a High-Density Corridor
Works were completed using microtunnelling, suited to the dense residential and commercial environment where surface disruption needed to be minimised. The pre-fabricated GRP bends allowed the alignment to navigate the required route without compromising the integrity of the jacking system.
Complete Pipe and Fittings from One Source
Supplying both the main pipe run and the pre-fabricated bends from a single source simplified procurement and reduced coordination risk for Adept Civil, supporting an efficient delivery program. Moonee Valley demonstrates Empire's capability to supply complete pipe and fittings packages for complex urban sewer upgrades, including fabricated components engineered to specific alignment requirements.